Home  | Products | Maintenance | About us | Contact  
   
 
Aquanet     AQ300 Maintenance Procedures
     

Regular  planned maintenance is important for the operation of the equipment.


There are 5 essential items for operation of this control panel.

  1. Sample and sample valve operation
  2. Probe Calibration (Normally every 30 days or sooner if abnormal readings are observed)
  3. Flow meter operation
  4. Dosing Pump operation
  5. Blowdown valve operation

The most common cause of equipment malfunction is caused by lack of probe calibration.

ROUTINE MAINTENANCE CHECKS
 

Daily Weekly Monthly Quarterly Yearly
Flowmeter Checks

Instructions

Sample Valve operational checks Instructions pH and conductivity Probe Calibration

Instructions

Backup Aquanet folder data

Instructions 

 

pH Probe replacement

Spares 

Dosing Pumps  Blowdown checks

Instructions

Check Oxygen Probe Operation

Instructions

Check if time to order new pH probe

Instructions

 
Low Level Do probes agree with tests (clean if necessary)    Packing grease pump (On HP Systems)

Change Packing Grease

Overhaul Instructions

 
Sample Temperature ok?   

 

     
Check parameters are in range